On September 30, 2019, the United States District Court for the Eastern District of Missouri, Eastern Division, issued an Opinion and Order setting forth the remedy required for Ameren Missouri’s violation of the Clean Air Act’s Prevention of Significant Deterioration (“PSD”) program. United States v. Ameren Missouri, No. 4:11-CV-77, Rec. Doc. 1122 (E.D. Mo.

After contesting the construction of the Dakota Access pipeline, environmental advocacy groups have turned their attention to the proposed Bayou Bridge pipeline in South Louisiana. The Bayou Bridge pipeline is a 162-mile-long, 24-inch-wide proposed pipeline which will cross the Atchafalaya Basin to connect facilities in Lake Charles, Louisiana to crude oil refineries in St. James